METEOR CENTRE Office Park building C has gone into the 2nd phase of construction

On the beginning of March, start on site for the second phase of the project, building C, was initiated. Grisom was selected as the Project Manager and technical supervisor of the works.

Read more...

ReferencesFit-Out retaily a kanceláře

back

Newbuild Albert supermarket Neratovice

The construction of this new supermarket for Albert has an area of 1 262 m2 and had to have a similar design as that of the surrounding retail units on the ground floor of the building. The sales area is 850 m2 and was completely reconstructed, it was necessary to partially replace the technology and equipment and the whole store’s image and style was installed a new within the retail space and façade. Part of the project was also the addition of a 30 space parking area with two handicapped parking and two parking areas for families with small children.

Ing. Jiří KunclIng. Jiří Kuncl

Albert Hradec Králové - Supermarket

Albert Hradec Králové - Supermarket

Remodeling supermarketu Albert, tj. úpravy prodejní plochy se zázemím na cca 2 300 m2 ve dvou podlažích, včetně výměny technologií a obnovy fasády.

Ing. David Jansa, Ph.D.Ing. David Jansa, Ph.D. Ing. Jiří KunclIng. Jiří Kuncl

Remodeling Albert supermarket Sokolníky, Prague 8

Extensive refitting was executed over three floors (sales area approx. 1 900 m2), including technology replacement. With a focus on limiting operational interruption most of the interruptive works were performed after hours, but the reconstruction was segmented such that the project was executed 24 hours per day.

Ing. Jiří KunclIng. Jiří Kuncl

Remodeling the supermarket for Albert; Prague, Karlovo nám.

The works comprised of extensive remodelling of the sales floor and expansion of the deli and bakery, by 19% to the detriment of the effective resolution of the spatial arrangement where storage was to be enlarged.   Thanks to the installation of energy saving lighting, new fridge cooling units, mechanical equipment, recuperative hot water heating by heat exchangers and an intelligent MaR, energy savings of 8% have been achieved as compared to the previous system. 

Ing. David Jansa, Ph.D.Ing. David Jansa, Ph.D.

Remodeling the Albert supermarket; Beroun, Husovo nám.

The conversion including the expansion of the store to an area of 410 m2 included a total renovation, change in the visual style of the store, and partial replacement of technology and equipment. With regards to the flooding in June of this year, preventative measures have been considered in the design works of the overall design of the project and implemented.

 

 

Ing. Jiří KunclIng. Jiří Kuncl

Remodeling Albert supermarket Semily

The conversion of the store sales area covered 410 m2 and included a total renovation, change in the visual style of the store, and partial replacement of technology and equipment. Despite the large scale of refitting in such a small space, the store carried on in operation during the works and was limited for the shortest time possible due to proper planning and coordination. All works were carried through according to the client’s needs for quality and the project was handed over complete with the kolaudation certificate in place.

Ing. David Jansa, Ph.D.Ing. David Jansa, Ph.D.