Czech  Czech
28. 06
2021

The residential project SBH Living has begun

SBH Living is a modern residential project with an emphasis on the comfort and privacy of residents. It consists of two four-storey buildings with 69 apartments, seamlessly connected to the historic buildings of the Štěrbohol center. The benefits...

Read more...

ReferencesIndustrial & Logistics

back

Cargo Partner Dobrovíz - installation of a refrigerated warehouse

In the ever-expanding logistics complex in Dobrovíz near Prague, we provided the installation of a refrigerated warehouse for Cargo - partner.The installation together with the expedition is designed as a separate cell of sandwich panels with floor plan dimensions of 52.5 m x 22 m, height 9 m and an expedition size of 11.5 m x 22 m, height 4 m.

Ing. David Jansa, Ph.D.Ing. David Jansa, Ph.D.

Denso Manufacturing Czech

The production plant is located in the South Industrial Zone in Liberec and covers an area of less than 260,000 m², the production halls occupy over 40,000 m². It also includes the Center for the Development of Car Air Conditioners. DENSOsupplies air conditioning units to customers from VW, Audi, BMW and TPCA.

Ing. Petr VacíkIng. Petr Vacík

Faurecia Leather Košice

Faurecia Leather Košice

Production plant on an area of approximately 21,000 m² in an industrial zone near Košice Airport for the production of leather modules, dashboards and door panels for customers of Peugeot, VW, Citroen, Volvo and Audi.

Ing. Aleš PulkrábekIng. Aleš Pulkrábek

Foxconn CZ Pardubice

 The construction of a new plant in Pardubice for the production of computers and components for use in electronics, which grew on a green field in less than five months, required investment costs of $ 50 million.

Ing. Aleš PulkrábekIng. Aleš Pulkrábek

Production and storage hall East West Line, Žalany

New construction of a production and storage hall, including a loading ramp with a total built-up area of 1000 m2 in the existing area, approximately 10 km from the city of Teplice.The construction of the hall was divided into 2 stages. The second stage of construction took place during full operation. Our task during the implementation was to ensure project management with TDI and a health and safety coordinator.

Ing. Jiří KunclIng. Jiří Kuncl

Production plant Kronodoor-Masonite

Production plant Kronodoor_Masonite   source: www.psj.cz

New hall of interior doors and door components in the Jihlava industrial zone in Hruškové Dvory measuring 30,000 m² contains, in addition to the production part and the warehouse of technical facilities, also a two-storey administrative building. The implementation included reinforced concrete retention tanks for rainwater harvesting with a volume of 450 m3 and fire tanks with a volume of 570 m3.

Ing. Jan BláhaIng. Jan Bláha

Production plant Mandík , Hostomice

Production plant Mandík, Hostomice   source: www.qarta.cz

Production site in Hostomice in the Beroun region on an area of 4,330 m² with an administrative building and facilities for almost 2,100 m² for one of the most important manufacturers of air conditioning components and industrial heating systems in the Czech Republic, Mandík. Realization of the construction by the Construction Management system, thanks to which there was a saving of approx. 25% compared to the offers of the General Delivery of the Construction.

Karel HavleKarel Havle

Production plant Pilsner Urquell - new packaging hall

Production plant Pilsner Urquell - new packaging hall    source: www.aukett.cz

The total area of the bottling plant occupies 25,196 m², including a warehouse with two lines, a hallwith pressure tanks, filtration and a pipeline bridge that connects the new halls withexisting operations. It was built in an incredible seven months and belongseven after more than seven years of operationto the most modern equipment in the Czech Republic.

Ing. Jan BláhaIng. Jan Bláha Ing. Petr VacíkIng. Petr Vacík

Sawmill Paskov

Sawmill Paskov   zdroj. Boris Renner

The Mayr-Melnhof Holz GmbH sawmill was built on an area of 21 hectares in eight months. Investment costs reached about 60 million euros. The production capacity of the cut is 1 million m3 of logs, the planing capacity is250,000 m3 and drying 380,000 m3.

Ing. Aleš PulkrábekIng. Aleš Pulkrábek

Storage park Pardubice - Starzone and Black Pine

The STARZONE and Black Pine Pardubice logistics complex is located 4 km from the center of Pardubice. The complex consists of three buildings. DC1 with an area of 11,371 m2 + 11,000 m2 parking with 30 docks, DC2 with 15,402 m2 with 23 docks and DC3 with 8,153 m2 with 7 docks. As part of Due Diligence, there was an assessment of the condition of construction and technological components of buildings and an assessment of the status of routine maintenance and post-warranty repairs, including quantification of future costs.

Ing. David Jansa, Ph.D.Ing. David Jansa, Ph.D. Ing. Jan BláhaIng. Jan Bláha

Supplier park PSA Trnava – Completion of a warehouse

Expansion of Hall 5 in the Supplier park PSA Zavar-Trnava. The hall will serve to store brake components for the VOITH production area in Hall 5. 

Ing. Aleš PulkrábekIng. Aleš Pulkrábek

Valeo Žebrák

Valeo Žebrák production plant with an area110,000 m², production unit 11,364 m² with a soldering line for the production of padding blocksand a line for the final assembly of the evaporators. Valeo is a manufacturer of evaporators designed for installation in the air conditioning of cars and trucks.

Ing. Vladimír MikolášekIng. Vladimír Mikolášek

Coca Cola Beverages CR

Production and storage halls, Prague

Ing. Petr VacíkIng. Petr Vacík